| |
|
|
Master Flash® Extreme Angle
Specifically designed for the metal roof industry, for applications with a 35 to 65 degree angle, while accepting and responding to the most commonly encountered pipe penetrations.
The built in 40° pitch allow the Extreme Angle Master Flash to handle any extreme roof pitch, sleeve flexibility accommodates vibration and pipe movemet caused by expansion and contraction. Easy on site customization handles all normal installations, too.
|
|
MASTER FLASH® FEATURES
WEATHER PROTECTION
Made of EPDM or Silicone, these flashings are compounded specifically for maximum resistance to weathering due to ozone and ultraviolet light.
EASY ON-SITE CUSTOMIZATION
Fast, one piece construction allows for easy on-site installation in usually 5 minutes.
BASE FLEXIBILITY
The soft aluminum base is designed to form a seal on most panel configurations and roof pitches regardless of pipe location.
DESIGN EXCELLENCE
Aztec's flexible design meets virtually all roofing needs. Sleeve flexibility accommodates vibration and pipe movement caused by expansion/contraction. the soft aluminum base easily conforms to roof panels. Master Flash® was used to create a new engineering standard for profiled roofing by the International Association of Plumbing and mechanical Officials(for the uniform Plumbing Code) and remains the only product listed. These products are also listed for use with Type B vents. The addition of fire retarding agents milled directly into the rubber compound created a self extinguishing feature which enables it to be used with Type B vents. Listed with IAPMO certification No. 3121.
|
| ADVANCED OZONE RESISTANCE tested to... |
|
SILICONE |
| 70 hours @ 500 pphm |
|
| HIGH TEMPERATURE RESISTANCE |
| Tested to |
Intermittent |
| |
Continuous |
|
| |
| +135ºC |
(+275ºF) |
| +100ºC |
(+212ºF) |
|
| |
| +260ºC |
(+500ºF) |
| +225ºC |
(+437ºF) |
|
| LOW TEMPERATURE RESISTANCE tested to... |
|
|
| COMPRESSION SET minimum... |
25% |
50% |
| Sizing Chart |
| |
Pipe Size |
Part Number |
Flashing Details |
|
| Extreme |
6 - 146mm |
MFEA1B |
A-Top opening diameter |
Closed |
|
1/4”– 5-3/4” |
|
B-Cut to suit pipe size |
6 - 146mm (1/4”– 5-3/4”) |
|
|
|
C-Base dimensions |
279mm (11”) |
|
SELECT
and TRIM...
Choose appropriate Master Flash with opening at least 20%
smaller than pipe diameter. If necessary trim opening to
20% smaller than pipe diameter.
|
 |
 |
|
SLIDE...
Slide Master Flash down over pipe. (A non-petroleum base
lubricant will ease installation.)
|
 |
|
|
FORM...
Press Master Flash down, bending it to conform to roof profile
or roof irregularities. A blunt tool will help press flashing
into tight roof angles.
|
 |
|
|
SEAL...
Apply sealant between base and roof.
|
 |
|
|
FASTEN...
Use fasteners to complete sealing. For UPC installation,
fastener spacing may not exceed 1-1/2" (38mm).
|
 |
|
Flashing Detail
|
SELECT
and TRIM...
Choose appropriate Master Flash with opening at least 20%
smaller than pipe diameter. If necessary trim opening to
20% smaller than pipe diameter.
|
 |
 |
|
SLIDE...
Slide Master Flash down over pipe. (A non-petroleum base
lubricant will ease installation.)
|
 |
|
|
FORM...
Press Master Flash down, bending it to conform to roof profile
or roof irregularities. A blunt tool will help press flashing
into tight roof angles.
|
 |
|
|
SEAL...
Apply sealant between base and roof.
|
 |
|
|
FASTEN...
Use fasteners to complete sealing. For UPC installation,
fastener spacing may not exceed 1-1/2" (38mm).
|
 |
|
|
|